Floor 26, Hall Mark Building, An Khanh Ward, HCMC
Scope of Work: Design Development & Build
YEAR: 2024
SIZE: 918 m2
CONSTRUCTION TIMELINE: 150 days
Where Finance Field Meets Modern Functionality
From the initial concept, our team prepared detailed technical drawings, selected materials, and proposed optimal construction solutions. Every aspect was refined to ensure feasibility, safety, and adherence to the project schedule.
The VPS Office project was executed based on the original design by M32 Design. Our role was to further develop the design to suit construction requirements and the client’s operational needs.
We carried out the complete interior construction, including production, installation, and finishing works. The construction process was closely supervised to guarantee quality, durability, and aesthetics in every detail, delivering a professional and comfortable workspace.